Changes between Version 11 and Version 12 of ProjectOverview


Ignore:
Timestamp:
Sep 5, 2010 8:45:25 PM (14 years ago)
Author:
Morris Swertz
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ProjectOverview

    v11 v12  
    3333
    3434 * __Ease finding and integration of resources using semantic and ontology technologies__ such as developed at EBI and NBIC/Concept Web Alliance to build bridges between data and tools, tapping into existing ontologies for data (e.g. HPO for human phenotype ontology) and for analysis protocols to help user and systems developers to bring tools together.
    35 
    36 == Ready-to-use databases and tools ‘in-a-box’ that can federate into national resources ==
     35=== Ready-to-use databases and tools ‘in-a-box’ that can federate into national resources ===
    3736As detailed below in the description of work  section, this project aims to develop novel or incorporate internationally proven key bioinformatics tools, databases, models and software such can be re-used by the smallest hubs (to accommodate and improve local research and complementation projects) up to the larges hubs (supporting rainbow projects, starting with Genoom van Nederland). By sharing the same components between all hubs we provide an effective path to
    3837
    39 ·        harmonize and enrich available data management, exchange and analysis protocols
     38 * harmonize and enrich available data management, exchange and analysis protocols
    4039
    41 ·        avoid duplicated efforts between local hubs
     40 * avoid duplicated efforts between local hubs
    4241
    43 ·        make it more likely that everyone’s needs are supported
     42 * make it more likely that everyone’s needs are supported
    4443
    45 ·        improve quality because more users test the available bioinformatics infrastructure
     44 * improve quality because more users test the available bioinformatics infrastructure
    4645
    47 ·        preserving flexibility to go beyond standardization and accommodate specific local needs.
     46 * preserving flexibility to go beyond standardization and accommodate specific local needs.
    4847
    49 =  =
    5048= 8. Duration of project: =
    51493 years